List of Facilities Containing ACBM

BuildingAsbestos-Containing Material / Location
Adams Halla) Asbestos Containing Floor Tile in random areas/rooms.
Hamilton Halla) Asbestos Containing Floor Tile in random areas/rooms.
Hancock Halla) Asbestos Containing Floor Tile in random areas/rooms.
Gallatin Halla) Asbestos Containing Floor Tile and Mastic throughout.
Madison Halla) Asbestos Containing Floor Tile in random areas/rooms.
Marshall Halla) Asbestos Containing Floor Tile and Mastic throughout.
Monroe Halla) Asbestos Containing Floor Tile in random areas/rooms.
Ross Halla) Asbestos Containing Floor Tile in random areas/rooms.
Washington Halla) Asbestos Containing Floor Tile and Mastic throughout.
b) Asbestos Containing Pipe Insulation in Generator Building.
Hale Centera) Boiler Insulation of Boiler in Basement.
Franklin CenterAsbestos Abatement Completed.
Jefferson Centera) Asbestos Containing Ceiling Finish (rough) throughout.
b) Asbestos Containing Acoustical Ceiling Tiles - upper level room.
c) Asbestos Containing Fireproofing - ground floor above acoustical ceiling.
d) Asbestos Containing Boiler Insulation.
e) Asbestos Containing Floor Tile throughout.
f) Asbestos Containing Roofing Paper located on roof/walkway on upper level.
Patrick Henry Centera) Asbestos Containing Floor Tile and Mastic in various hallways and rooms.
b) Roof Flashing Material on 3rd Floor Roof.
Sewall CenterNo Asbestos Contain Material Identified.
John Jay Centera) Asbestos Containing Floor Tile in Rooms 21, 22, & 23
b) Asbestos Containing Floor Tile and Mastic throughout 1st Floor/Eng. Dept.
Admissions and Visitors Centera) Asbestos Containing Roofing Materials
Lafayette Centera) Asbestos Containing Floor Tile - 1st floor bottom of stairs.
b) Asbestos Containing Ceiling Tile - 2nd floor stairwell.
Massey HallNo Asbestos Containing Materials Identified.
Barry CenterNo Asbestos Containing Materials Identified.
Revere CenterNo Asbestos Containing Materials Identified.
Pittsburgh 600a) Various Floor Tiles, Floor Sheeting, Stair Treads and Floor Tile Mastic throughout.
b) Mudded Type Pipe Fitting Insulation throughout.
c) Spray-On Fireproofing in the 5th and 6th floors (Library).
d) Corrugated and Block Type Pipe Insulation throughout.
e) Spray-On Acoustical Paint throughout the ground and 1st floor.
Pittsburgh 718a) Corrugated and Block Type Pipe Insulation in Basement Area (building interior only).